Here is what was inside the panel once we opened it up:
We had to reroute the wires up through the ceiling and down through a different wall (also note the PVC drain pipe that Rodney moved a couple of weeks ago... we've even tested it and no leaks yet!)
Master electrician at work:
The rerouted wires are all going to their new blue box. Now, to get everything crammed in there and connected properly...
Voila! And by some small miracle, the switches worked once we turned the power back on! And there was much rejoicing!
2 comments:
Very impressive stuff.
Yes, Joanie, we were more than pleased with the outcome. ;)